| Project: | Procurement of the biggest paper machine with on-machine coater for Hokuetsu Paper Mills, Ltd. |
|---|---|
| Location: | Niigata Prefecture, Japan |
| Type of contract: | EPE |
| Specification: | Procurement and installation work of a paper machine |
| Remarks: | This order was awarded by Hokuetsu Paper, which includes installation work of the biggest paper machine of Metso, a Finnish maker, for its Niigata paper mill. The machine, with a productive capacity of 10.7m(width) paper at 1,600m/min. started operation in the autumn of 2008. The state-of-the-art paper machine is the biggest in Japan. |

| Project: | Bleaching craft pulp & paper mill construction in Vietnam |
|---|---|
| Location: | Son Duong, Tuyen Quang, Vietnam |
| Type of contract: | EPE |
| Specification: | Procurement and installation of equipment |
| Remarks: | It is the biggest pulp and paper mill plant to be built in Vietnam. This order was awarded to Marubeni and MAPEC in 2006 as their actual results in the paper industry were fully evaluated by the client from the technical point of view and also price-wise. As of June 2011, trial operations are being performed toward the inauguration of the plant. |

| Project: | Modification of the paper machines for Bai Bang Paper Company |
|---|---|
| Location: | Phong Chan town, Phu Tho province, Vietnam |
| Type of contract: | EPS |
| Specification: | Procurement of equipment and dispatching of instructors |
| Remarks: | This order is to modify two existing paper machines of Bai Bang Paper Company, the biggest state-owned paper company in Vietnam, by raising productive capacity to 100,000t/year from 60,000t/year. These modified machines are now in full operation, taking advantage of the instructors dispatched for effective quality control and operation, in addition to the selection of the most suitable modification. |

| Project: | 26.07MW Co-generation Plant for Thai Cane Paper Public Co., Ltd |
|---|---|
| Location: | Suburb of Kabinburi city (180km east of the center of Bangkok) |
| Type of contract: | EPE |
| Specification: | Design, manufacture, installation and test run of co-generation plant equipment excluding the boiler (BOP such as turbine generator, coal conveying system, demineralization system, cooling tower, DCS & electric equipment), and whole installation work of Foster Wheeler's CFB boiler on site |
| Remarks: | It was inaugurated in September 2006. As of February 2009, it is working satisfactorily with 200 total operation hours. |

| Project: | Co-generation BOP Works for Phoenix Pulp and Paper Public Co., Ltd. |
|---|---|
| Location: | Khon Kaen, Thailand |
| Type of contract: | EPE |
| Specification: | Design, procurement of equipment and installation works of 1.2MW co-generation BOP (including turbine/generator) |
| Remarks: | The 3rd plant contract awarded in a row by SCG group in Thailand. The order was placed in 2006 and completed in 2008. The plant was planned for supplying steam/power mainly to newly built paper mills. It is working efficiently for the above purpose. |

| Project: | Co-generation plant project for Jiangsu Oji Paper Co., Ltd. |
|---|---|
| Location: | Nantong, Jiangsu, China |
| Remarks: | The contract for co-generation plant, a portion of the complex construction of a paper mill for Jiangsu Oji Paper was awarded in 2008. Marubeni obtained final acceptance certificate in March 2011. |

| Project: | Procurement of the biggest coated paper machine for Moorim P&P Co., Ltd. (Former "Donghae Pulp Co. Ltd.") |
|---|---|
| Location: | Ulsan, Korea |
| Type of contract: | EPSM |
| Specification: | Procurement and installation work of a coated paper machine including detailed engineering work |
| Remarks: | Marubeni joined in the project as an engineering company to install a large A2-size coated paper machine to the biggest KP plant in Korea to make an integrated operation plant by raising productive capacity to 450,000t/year. This order is to modify the existing paper mill facility providing detailed facility flow, layout, piping design, etc. It was inaugurated in March 2011. As of June 2011, it is working satisfactorily. |